Full integration of the 300 GHz PoC WP WP6 Number D6.3 Due Month Wed, 12/31/2025 - 12:00 TIMES_D6.3_Full integration of the 300 GHz PoC.pdf (3.09 MB)
Integration and validation of MODEM+RF Front ends WP WP6 Number D6.2 Due Month Tue, 09/30/2025 - 12:00 TIMES_D6.2_Integration and validation of MODEM RF Front end.pdf (14.15 MB)
Validation of MODEMS and Integration of joint PHY/MAC WP WP6 Number D6.1 Due Month Mon, 06/30/2025 - 12:00 TIMES_Deliverable_D6.1.pdf (4.34 MB)